Development

Fees and Charges

For a full list of fees and charges, please click here.

Development  Fees and Charges

Classification                             Thresholds
 Rezoning (HA)       Subdivision of land (Lots1)  
 Minor

 <0.4

 2

 Medium

 1.4 - 1.0

3-10 

 Major

 >1.0 - 3.0

 11-25

 Significant

 >3.0

 >252

 
Note 1: Total lots in the subdivision/boundary adjustment
Note 2: Development with major infrastructure (e.g. sewage pump station, water pump station, reservoir, pressure reducing station) defaults to significant.

Classification     Non-subdivision/building applications/plumbing applications    

Thresholds

  Minor1

 0 - 2 ET typically including:

• Single dwelling/extension/alteration
• One or two units/town houses
• Auxiliary dwelling/dependence unit
• Shed/garage/carport
• Demolition
• Shop refit
• Light industrial/commercial/retail site / <0.15Ha
• Minor extension to commercial/light industrial/retail
• New connections
• Change of use

  Medium2

 >2 - 10 ET typically including:

• Three (3) to 10 dwellings/units/town houses/dependence units
• Light industrial/commercial/retail site/0.15-0.3Ha
• New/modified backflow protection devices
• New/modified fire protection/metering services
• Restricted or wayside water connection

  Major3  >10 - 30 ET typically including:

• 11-30 dwellings/units/townhouses/dependence units
• Industrial/commercial/retail site/>0.3Ha - 1.5Ha
  Significant4  >30 ET typically including:

• >30 dwellings/units/town houses/dependence units
• Heavy industrial/commercial/retail site/>1.5Ha
• Effluent reuse/development within buffer areas

 

Connections and disconnections

Water connections

2018-19

GST

Standard 20mm water connection

$2,182.90

N

Standard 25mm water connection

$2,395.21

N

Non-standard water connection

POA

N

20mm meter supply and installation

$403.47

N

>20mm meter supply and installation

POA

N

Sewer connections

2018-19

GST

Standard 100mm sewerage connection

$1,570.66

N

Non-standard sewer connection

POA

N

Disconnection

2018-19

GST

Standard disconnection (water and/or sewerage)

$446.98

N

Relocation

2018-19

GST

Standard water connection relocation – under 3 metres

$1,461.39

N

Water connection relocation – greater than 3 metres

POA

N

Standard sewerage connection relocation – under 10 metres

$1,535.13

N

Standard sewerage connection relocation – greater than 10 metres

POA

N

Fire service

2018-19

GST

Fire service installation

POA

N

Water metering fees

2018-19

GST

Special meter reads

$59.16

N

Meter testing - onsite

$79.49

N

Meter testing - offsite

POA

N

Meter downsizing (50mm to 20mm)

$366.54

N

Meter downsizing (all others)

POA

N

Sundry fees

2018-19

GST

Section 56W consent fee

$46.08

N

Right to information request

25 fee units ($39.25)

N

Inspection costs

$59.07/hr

N

Property Information Plan

$45.49

N

Pressure and flow testing

$104.99/hr

N

Land Information Certificate (56ZQ) request

25 fee units ($39.25)

N

Restriction charge

$105.16

N

 

Development assessment fees
(these fees apply to all development, subdivision, building and plumbing applications)

Development application -

2018-19

GST

Minor

$211.63

Y

Medium

$351.28

Y

Major

$675.71

Y

Significant

$1,139.79

Y

Certificate for certifiable works (building and plumbing applications) / Certificate of Compliance (BAs & PAs)

2018-19

GST

Minor

$300.05

N

Medium

$389.53

N

Major

$438.76

N

Significant

$553.71

N

CCW Exemption

$39.68

N

Engineering design approval / asset creation inspection and data capture

2018-19

GST

Minor

$297.57

Y

Medium

$565.06

Y

Major

$1,419.11

Y

Significant

$2.024.99

Y

Consent to register a legal document

2018-19

GST

Minor

$149.20

Y

Medium

$149.20

Y

Major

$149.20

Y

Significant

$149.20

Y