These charges relate to the 2025 Financial Year.
For a full list of fees and charges, please click here.
Developer Fees and Charges
For more information about Developer Charges click here.
Classification | Rezoning (HA) | Subdivision of land (lots) |
Minor | <0.4 | 2 |
Medium | 0.4 - 1.0 | 3 - 10 |
Major | >1.0 - 3.0 | 11 - 25 |
Significant | >3.0 | >25 |
Complex | Case-by-case | Case-by-case |
Note 1: Total lots in the subdivision/boundary adjustment
Note 2: Development with major infrastructure (e.g. sewage pump station, water pump station, reservoir, pressure reducing station) defaults to significant).
Note 3: Case by case assessment will determine if an application is materially beyond the significant classification and qualify as complex (e.g. projects of state significance).
Classification | Thresholds |
Minor | 0 - 2 ET typically including: Single dwelling/extension/alteration One or two units/town houses Auxiliary dwelling/dependence unit Shed/garage/carport Demolition Shop refit Light industrial/commercial/retail site / <0.15Ha Minor extension to commercial/light industrial/retail New connections Change of use |
Medium | >2 - 10 ET typically including: Three (3) to 10 dwellings/units/town houses/dependence units Light industrial/commercial/retail site/0.15-0.3Ha New/modified backflow protection devices New/modified fire protection/metering services Restricted or wayside water connection |
Major | >10 - 30 ET typically including: 11-30 dwellings/units/townhouses/dependence units Industrial/commercial/retail site/>0.3Ha - 1.5Ha |
Significant | >30 ET typically including: >30 dwellings/units/town houses/dependence units Heavy industrial/commercial/retail site/>1.5Ha Effluent reuse/development within buffer areas |
Complex | Materially beyond the parameters of the significant classification (e.g. a project of state significance) |